Merged and never uploaded: npm refused the token the release publishes with (#662). What this section lists first reached npm in 2.7.11.

Fixed#

  • plan offered the Batch API to calls that cannot take it. Two kinds, both measured. Twenty calls that had already run on the Batch API, a $0.07 bill at the batch rate, were offered "$0.0350 projected" for batching them: half of a price that was already the half. And a converted Claude Code session was told to "route and batch" every turn of an agent loop, $9.13 projected against the example projects' $12.70 bill, on the assumption that "these calls can wait for a batch window". The assumption was printed, so the plan did not lie; it asked a question the log could have answered, and counted the answer into the total before it came. A record can now say "interactive": true, meaning something waited on the answer, and from-claude-code, from-codex and from-gemini-cli say it on every line. The batch lever leaves out those calls and the ones already billed at the batch rate, in its own figure and in the combined route-and-batch one, each at its own model's rate. The same projects now read "Route", $7.34 projected, and the plan ends by saying how much input and output it left out and why (batchExcludedUsd in the document). A route that combines nothing no longer says "combined with batching". A log that marks nothing is read exactly as before. The profile's breakdown gains batchExcludedInputTokens, batchExcludedOutputTokens and batchExcludedUsd, and fieldCoverage counts interactive; a document from before the fields existed reads them as zero. Thirteen faults planted in the lever, the parser, the roll-up, the plan and its renderers were each caught.
  • The recovery for a release that lost its tag was one step short. docs/releasing.md said that a person pushes the tag and the run it starts creates the release. That run verifies the tagged tree first, and a tree that is days old can fail a test that reads the calendar: 2.7.2's has since 2026-11-16, on a promotional price in its last 45 days. The page now says the failed run is expected when the recovery comes late, and names the second step, backfill-releases with the version and the commit, which creates the release on the tag once it exists. It also says why the tag itself stays a person's step.